{"id":50006,"date":"2025-12-03T11:57:25","date_gmt":"2025-12-03T11:57:25","guid":{"rendered":"https:\/\/bestmaresme.com\/blog\/?p=50006"},"modified":"2025-12-03T11:57:25","modified_gmt":"2025-12-03T11:57:25","slug":"el-maresme-ya-tiene-financiacion-para-la-n-2-y-la-c-32","status":"publish","type":"post","link":"https:\/\/bestmaresme.com\/blog\/ru\/el-maresme-ya-tiene-financiacion-para-la-n-2-y-la-c-32\/","title":{"rendered":"The Maresme region already has funding for the N-2 and C-32 highways"},"content":{"rendered":"<p>Finally, the Spanish Government has given the green light to the agreement with the Generalitat that will make possible the <span style=\"color: #993366;\"><strong>investment of 384 million euros<\/strong><\/span> for the so-called &#8220;pacification&#8221; of the <strong>N-2 State Road<\/strong> and the transfer of traffic to the <strong>C-32 Highway<\/strong>.<\/p>\n<p>The project began to take shape 16 years ago, with the transfer of the N-2 highway to the Catalan government and the Spanish government&#8217;s commitment to contribute to its financing. However, for various reasons, the plan was shelved for years. Until now, that is, because through an agreement between the two administrations in the Infrastructure Investment Commission (February 2025), the government has activated the mechanism that will allow the agreement to be formalized and the financing to move forward.<\/p>\n<p>The \u20ac384 million will be delivered over 8 years as follows:<\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li><span style=\"color: #993366;\"><strong>\u20ac5<\/strong><\/span> million in 2025<\/li>\n<li><span style=\"color: #993366;\"><strong>\u20ac24<\/strong><\/span> million in 2026<\/li>\n<li><span style=\"color: #993366;\"><strong>\u20ac70<\/strong><\/span> million in 2027, 2028, 2029 and 2030<\/li>\n<li><span style=\"color: #993366;\"><strong>\u20ac60<\/strong><\/span> million in 2031<\/li>\n<li><span style=\"color: #993366;\"><strong>\u20ac15<\/strong><\/span> million in 2032<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<figure id=\"attachment_50022\" aria-describedby=\"caption-attachment-50022\" style=\"width: 650px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-50022\" src=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-3.jpg\" alt=\"\" width=\"650\" height=\"365\" srcset=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-3.jpg 657w, https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-3-300x168.jpg 300w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-50022\" class=\"wp-caption-text\">N-2 State Road<\/figcaption><\/figure>\n<p>This agreement aims to <span style=\"color: #993366;\"><strong>transform the N-2<\/strong><\/span> as it passes through the Maresme region (between Montgat and Tordera) into a road with less traffic intensity, thus achieving its integration into the various urban centers, through the reduction of vehicle traffic (about 10,000 vehicles per day) and the creation of new spaces for pedestrians and bicycles, among other measures.<\/p>\n<p>The Catalan government&#8217;s Department of Territory is also working on creating <span style=\"color: #993366;\"><strong>new access points to the C-32 highway<\/strong><\/span> from several municipalities in the Maresme region. This project is expected to require an investment of around \u20ac120 million, with the aim of increasing traffic on the C-32 and facilitating the conversion of the N-2 highway.<\/p>\n<figure id=\"attachment_50015\" aria-describedby=\"caption-attachment-50015\" style=\"width: 650px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-50015\" src=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto.jpg\" alt=\"\" width=\"650\" height=\"367\" srcset=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto.jpg 1158w, https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-300x170.jpg 300w, https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-1024x579.jpg 1024w, https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2025\/12\/Foto-768x434.jpg 768w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-50015\" class=\"wp-caption-text\">C-32 Highway<\/figcaption><\/figure>\n<p>This latter point has been the subject of <strong><span style=\"color: #993366;\">protests<\/span><\/strong> in certain towns in the Maresme and among some environmental groups, to the point that the Catalan government has announced that the planned work in Canet de Mar will not be carried out, in response to pressure against its implementation.<\/p>\n<p>&nbsp;<\/p>\n<p><b><strong><a href=\"https:\/\/api.whatsapp.com\/send?l=es-ES&amp;phone=34608010051\" rel=\"attachment wp-att-17273\"><img decoding=\"async\" loading=\"lazy\" class=\"desp-petit aligncenter wp-image-17273\" src=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2023\/05\/casas-en-el-maresme-mobil-en.png\" alt=\"\" width=\"394\" height=\"246\" \/><\/a><a href=\"https:\/\/api.whatsapp.com\/send?l=es-ES&amp;phone=34608010051\" rel=\"attachment wp-att-17274\"><img decoding=\"async\" loading=\"lazy\" class=\"desp-gran aligncenter wp-image-17274 size-full\" src=\"https:\/\/bestmaresme.com\/blog\/wp-content\/uploads\/2023\/05\/casas-en-el-maresme-en.png\" alt=\"\" width=\"700\" height=\"175\" \/><\/a><\/strong><\/b><\/p>","protected":false},"excerpt":{"rendered":"<p>Finally, the Spanish Government has given the green light to the agreement with the Generalitat that will make possible the investment of 384 million euros&hellip; <\/p>\n","protected":false},"author":1,"featured_media":50013,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[117,172,234],"tags":[52,19,22],"_links":{"self":[{"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/posts\/50006"}],"collection":[{"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/comments?post=50006"}],"version-history":[{"count":22,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/posts\/50006\/revisions"}],"predecessor-version":[{"id":50033,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/posts\/50006\/revisions\/50033"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/media\/50013"}],"wp:attachment":[{"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/media?parent=50006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/categories?post=50006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bestmaresme.com\/blog\/ru\/wp-json\/wp\/v2\/tags?post=50006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}